Hi,
I have a sequencer Seq1 that looks like this:
jobA --> JobB --> JobC
I want to apply the rule 'Abort after n warnings' only to JobB
when n is detemined by a parameter when executing the Seq1
How can I do this ?
Is there a way to do this:
jobA --> Routine_set_B_warn_limit --> JobB --> JobC ???
Amos
Job dynamic warning limit
Moderators: chulett, rschirm, roy
-
- Premium Member
- Posts: 385
- Joined: Tue Oct 07, 2003 4:55 am