Hi Experts,
Actually i modified a job and then saved it and compiled it.
The OSH code that is getting generated for the new modified job is not getting updated, its the same for the previous job.
Also i removed everything from the design workspace and emptied it.Even then if i compile it the OSH code generated is of the previous original job.
Could any one suggest something on this?
If i run the empty job then also it is running and the logs are showing all the stages of the original job.
Please help anyone