Hi All,
We are currently in the process of upgrading from DataStage v8.5 to v9.1
Linux is the Platform that is used currently and will be used for the future version as well.
I have never worked in an upgrade project before and would like to understand the steps that should be performed for upgrading from v8.5 to v9.1.
Apologize for my lack of knowledge.
Kindly share any inputs that you might have pertaining to this query.
Thanks,
George
DataStage Upgrade
Moderators: chulett, rschirm, roy
-
- Premium Member
- Posts: 11
- Joined: Tue Oct 29, 2013 7:25 pm
- Location: USA
Re: DataStage Upgrade
There are couple of things you can do
1. If the 9.1 version is already installed and you are moving just the jobs, you can run the ISA lite report on 9.1 and check with the report you run in 8.5
2. Use the Operations console and get the server stats, like CPU,memory and swap space ...etc
3. make sure you have /temp 4GB
4. create the necessary mount points in new servers
5. configure the default.apt file according to the server
6. Connectors and plugins, binaries, open any firewall ports and check the ID's, compiler settings
7. Please check if you apply any special patches in V8.5 and make sure they are there in V9.1
Thanks
1. If the 9.1 version is already installed and you are moving just the jobs, you can run the ISA lite report on 9.1 and check with the report you run in 8.5
2. Use the Operations console and get the server stats, like CPU,memory and swap space ...etc
3. make sure you have /temp 4GB
4. create the necessary mount points in new servers
5. configure the default.apt file according to the server
6. Connectors and plugins, binaries, open any firewall ports and check the ID's, compiler settings
7. Please check if you apply any special patches in V8.5 and make sure they are there in V9.1
Thanks
A Kumar
-
- Premium Member
- Posts: 11
- Joined: Tue Oct 29, 2013 7:25 pm
- Location: USA
-
- Premium Member
- Posts: 11
- Joined: Tue Oct 29, 2013 7:25 pm
- Location: USA
-
- Participant
- Posts: 54607
- Joined: Wed Oct 23, 2002 10:52 pm
- Location: Sydney, Australia
- Contact:
-
- Premium Member
- Posts: 209
- Joined: Fri Jan 09, 2004 1:14 pm
- Location: Toronto, Canada
- Contact:
Looks like the concierge program is done, as is the migration tool.
The InfoSphere Information Server Concierge Program is withdrawn as of Dec 21, 2013
See this link: http://www-01.ibm.com/support/docview.w ... wg21445403The "migration tool" is no longer generally available
Rob Wierdsma
Toronto, Canada
bartonbishop.com
Toronto, Canada
bartonbishop.com