I got few job running at everyday 6am.
But i look through those job in Director , those job are not scheduled. (These job probably is schedule before and is set to run once)
Any idea why those job run without schedule?
Thanks
Job run automatic without any schedule
Moderators: chulett, rschirm, roy
-
- Participant
- Posts: 63
- Joined: Mon Sep 12, 2011 2:11 am
-
- Participant
- Posts: 54607
- Joined: Wed Oct 23, 2002 10:52 pm
- Location: Sydney, Australia
- Contact:
Nor will the schedule show up in Director unless the job was actually scheduled from there. For example, if you are using a third party scheduler, such as AutoSys, then the Director client has no knowledge of this; you must use the third party tool to view the schedule.
IBM Software Services Group
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.
-
- Participant
- Posts: 63
- Joined: Mon Sep 12, 2011 2:11 am