Hi,
six months back IBM person installed the datastage. But Job is hanging every half an hour. I have used one shared container and loop variables in my jobs.
Is it problem because of this?.As of now we do not have any admin for my project.
operating system - red hat linux.
datastage - 8.5.0.1
database- teradata
metadata database - oracle.
Please help me.
hanging the datastage job
Moderators: chulett, rschirm, roy
-
- Participant
- Posts: 54607
- Joined: Wed Oct 23, 2002 10:52 pm
- Location: Sydney, Australia
- Contact: