Hi,
when we are running our main sequence (in this total 1375 jobs), some jobs are failing with the error
Job control process (pid 26562) has failed .
ie Job control process (pid xxxxx) has failed.
due to some jobs failing with this error,our daily load not completing.
if we ran the failure jobs,its completing successfully.
can you please any one help me how to resolve this Job control process (pid xxxxx)has failed, these errors.
Job control process (pid 26562) has failed
Moderators: chulett, rschirm, roy
-
- Participant
- Posts: 135
- Joined: Tue Dec 09, 2008 10:35 am
-
- Participant
- Posts: 597
- Joined: Fri Apr 29, 2005 6:19 am
- Location: Singapore
-
- Participant
- Posts: 54607
- Joined: Wed Oct 23, 2002 10:52 pm
- Location: Sydney, Australia
- Contact:
This error usually occurs if the controlling process (sequence, process running dsjob, job executing DSRunJob, etc.) is killed or if connection between the node and the conductor is lost for any reason. This is why a re-run is usually successful - the interruption does not occur the second time. They have the annoying property of being intermittent faults.
IBM Software Services Group
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.