Hi
In our Production environment we are getting following warning.
This causes the job to fail when sequencer runs for 2nd time.
Warning:- seq_aaa_dly_load..JobControl (@Coordinator): The current job run does not have the same parameters as its checkpoint record.
we are trigger from CONTRol-M.
Thanks
Man
Job Sequence Warning JobControl (@Coordinator)
Moderators: chulett, rschirm, roy
-
- Participant
- Posts: 31
- Joined: Mon Jun 28, 2010 5:15 am
- Location: pune
Re: Job Sequence Warning JobControl (@Coordinator)
everytime you rerun the the sequence it gets a new process id, hence when you are rerunnng you receive this warning. If you check the director for the current paraments passed you will see this mentioned in the log as (current/ previous paramenter).
In the sequence that you are rerunning you need to select 'Reset if required , then run' option to avoid this error