Hi All,
My requirement is, scheduling a job to run in different timings in a single day using datastage director.
As per my knowledge, we can shedule a job in a particular time in a single day using Director.
Can any one of you tell me the way to run a job in different timings in a single day.
Thanks in Advance.
Shedule a job for different timings in a single day
Moderators: chulett, rschirm, roy
-
- Participant
- Posts: 26
- Joined: Mon Oct 25, 2010 6:09 am
- Location: Hyderabad
Shedule a job for different timings in a single day
Thanks & Regards,
HARIRAM
Software Engineer
HARIRAM
Software Engineer
-
- Premium Member
- Posts: 892
- Joined: Thu Oct 16, 2003 5:18 am
-
- Participant
- Posts: 26
- Joined: Mon Oct 25, 2010 6:09 am
- Location: Hyderabad
Thanks for your Immediate response.jpraveen wrote:Hi hari,
you can schedule the job in different timings in same day,
Add to schedule-> Daily->give specific time
and again
Add to schedule-> Daily->another timing
so that you can schedule many times to run the same job in a day
And also Can you suggest me how can I run the same job in multiple times at the same time.
Thanks & Regards,
HARIRAM
Software Engineer
HARIRAM
Software Engineer
-
- Participant
- Posts: 26
- Joined: Mon Oct 25, 2010 6:09 am
- Location: Hyderabad
Thanks for your respnose Srini.Sreenivasulu wrote:Basically you can create multipe schedules for the same job . But you need to make it multi-instance to avoid a conflict .
Regards
Sreeni
But can you explain me, this multi instance concept in a detailed manner.
what is the advantage of this multi-instance and where I have to select.
Thanks & Regards,
HARIRAM
Software Engineer
HARIRAM
Software Engineer