Hi,
I am using AIX server, in which datastage v8.1 is installed.
I have a scenario that while developing the PX jobs i used 2 node configuration. Now i want the jobs to run on 4 node configuration due to performance enhancements. So, If i change the configuration file to 4 node, then will i get any warnings during the execution of parallel jobs??
Thanks in Advance
G.K.K
Converting 2 node Parallel Jobs to 4 node
Moderators: chulett, rschirm, roy
-
- Participant
- Posts: 54607
- Joined: Wed Oct 23, 2002 10:52 pm
- Location: Sydney, Australia
- Contact: