I am working on converting the server job into Parallel job. which is using Aggregator stage in it.
Its running fine with the following warining (APT_CombinedOperatorController(6),1: APT_Decimal::operator=: the source decimal has even precision, but non-zero in the leading nybble, or is too large for the destination decimal.) and i am able to match amount in the end but when i comapre the number of output records after the aggregator stage in the serevr and parallel was different. No records droping in the log.
I implemented the same logic in the tranformer too. I got the same result
can any one help me on this?
and also how to remove the following error
APT_CombinedOperatorController(6),1: APT_Decimal::operator=: the source decimal has even precision, but non-zero in the leading nybble, or is too large for the destination decimal.
Aggregator issue while converting the server to paralle job
Moderators: chulett, rschirm, roy
-
- Participant
- Posts: 54607
- Joined: Wed Oct 23, 2002 10:52 pm
- Location: Sydney, Australia
- Contact:
Disable operator combination so you can learn exactly which operator (stage) is throwing the error. This may shed some light on what is (or is not) happening.
IBM Software Services Group
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.