Hi, who can help me on a problem I never had on previous release of data stage?
I've developed 3 routines and I saved them in a new folder PRJ inside Routines category. I Exported them in a dsx file (I tried with all options: source, object, both...). When I try to import them from this dsx file to a differente Repository I have a message like:
3 objects ignored....
You can see if a routine is read-only by double clicking on it in designer and at the top of the window it will show (Read-Only)
Also all the buttons are grey except Close and Help, so you cannot save or compile it.
If your routines are not read-only then it must be something in the new projects -maybe you are not set up as a developer in the Suite admin or the directory/file permissions for the project are goofy.
You can see if a routine is read-only by double clicking on it in designer and at the top of the window it will show (Read-Only)
Also all the buttons are grey except Close and Help, so you cannot save or compile it.
If your routines are not read-only then it must be something in the new projects -maybe you are not set up as a developer in the Suite admin or the directory/file permissions for the project are goofy.
mfavero wrote:You can see if a routine is read-only by double clicking on it in designer and at the top of the window it will show (Read-Only)
Also all the buttons are grey except Close and Help, so you cannot save or compile it.
If your routines are not read-only then it must be something in the new projects -maybe you are not set up as a developer in the Suite admin or the directory/file permissions for the project are goofy.
Have the dsadm try the import.
My routines are not read only (I can save and compile them).
I am dsadm when I try to import them.
I'll Check directory/file permissions ...
I've seen the same behaviour on a 7.5.1A server where it would sometimes just refuse to import routines if that was all that was in the export file. I don't remember if there was a resolution or not, I think what I ended up having to do was include at least one job in the mix. It definitely smelled of bug to me.
-craig
"You can never have too many knives" -- Logan Nine Fingers
You can try that, but I think I had to actually import everything, job and all, to get the routines to come along for the ride. It's been awhile, so who knows. Let us know, if anything, works for you.
-craig
"You can never have too many knives" -- Logan Nine Fingers
I am having the same problem with Datastage 8.1 on Windows 2003. No routines will import in either DSX or XML format. IBM states that this is a known bug listed as APAR JR31756. The link with the details are under http://www-01.ibm.com/support/docview.w ... wg1JR31756
The notes say that there is a patch listed for this problem as patch # JR31326 which I cannot find in FixCentral. I am still waiting for a response from IBM.