Hello,
I have a sequence job A that calls B that calls C that calls a parallel job D. The "Do not checkpoint run" is checked on B and C only.
Now if D aborts, I expect the abort status to bubble up to C, B and A, and checkpoint should be established only at A. The question is, is that assumption correct, and if not, and C, B and A log only warning messages, no checkpoints will be set at A. Therefore how do I go about enabling the checkpoint at A to be set?
Thanks for your help.
Establishing checkpoints
Moderators: chulett, rschirm, roy
-
- Participant
- Posts: 54607
- Joined: Wed Oct 23, 2002 10:52 pm
- Location: Sydney, Australia
- Contact:
Look at the log. Checkpoints occur when an activity completes successfully. Therefore, if A completed successfully, it will be checkpointed. On the next run of the sequence (after D fails), A will be skipped. B and C will not be skipped, because this is what "do not checkpoint run" means.
IBM Software Services Group
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.