mgration from 5.22 to 7.5.2
Moderators: chulett, rschirm, roy
mgration from 5.22 to 7.5.2
Hi,
Need information whether I can migrate my Datastage 5.22 version to Datastage 7.5.2 Version directly.
Are there any problem invovled in migration?
Any help is appreciated.
Need information whether I can migrate my Datastage 5.22 version to Datastage 7.5.2 Version directly.
Are there any problem invovled in migration?
Any help is appreciated.
Thanks
Yes, you can migrate directly. Many such migrations will go without a hitch, but sometimes you might encounter issues. Is it a complex implementation and are there a lot of "special" programs or code? I can't recall if one was still allowed to change parameter values inside jobs at V5, but if yes and you used that functionality you might have to change some of your jobs.
Problems, if any, should be detected at compile time rather than at runtime.
Problems, if any, should be detected at compile time rather than at runtime.
<a href=http://www.worldcommunitygrid.org/team/ ... TZ9H4CGVP1 target="WCGWin">
</a>
</a>
It sounds like you know more than I do; I haven't heard of the "X Migrator" and don't know what it will do. Perhaps someone else will chime in here and explain that to both of us.
<a href=http://www.worldcommunitygrid.org/team/ ... TZ9H4CGVP1 target="WCGWin">
</a>
</a>
-
- Participant
- Posts: 54607
- Joined: Wed Oct 23, 2002 10:52 pm
- Location: Sydney, Australia
- Contact:
You can migrate your 5.X to 7.X server to server without much strain. But new features & stages should be handfixed.
Hope its usefull.
In case you need to migrate from Server jobs to Parallel jobs, then Xmigrator comes in picture. In your migration I dont think Xmigrator is needed.Use Install and Upgrade Guide's chapter on upgrading and get vendor support.In general you will export each project as a backup first and the upgrade process will automatically upgrade and compile all of your jobs(server)
Hope its usefull.
Thanks, BK
Hi Ray,ray.wurlod wrote:So not all that relevant to an ETL tool then? ...
Can you please help me the with approach in brief that i need to follow and the possible difficulties that I can face while migrating?
Also is this migration a one step process i.e. directly from Version 5.22 to version 7.5.2??
Or are there any intermediate steps like first converting to any of the intermediate version???
My existing datastage server is in unix platform and datastage cleint is on winodws XP.
Thanks in advance.
Hi,Can you please explain more about the upgrade process which you say will happen automatically from 5.22 server to7.5 server??Is the support from vendor absolutely necessary?tkbharani wrote:You can migrate your 5.X to 7.X server to server without much strain. But new features & stages should be handfixed.In case you need to migrate from Server jobs to Parallel jobs, then Xmigrator comes in picture. In your migration I dont think Xmigrator is needed.Use Install and Upgrade Guide's chapter on upgrading and get vendor support.In general you will export each project as a backup first and the upgrade process will automatically upgrade and compile all of your jobs(server)
Hope its usefull.
Thanks in advance.
Its a bit big process in migrating 5.x to 7.x. There different way's how you install or upgrade Datastage.
1. If you have done any installition or upgradition of Datastage previously then you can go straight for a migration with minimal support from vendor, any way DSXCHANGE is there
2. You should have good command over Datastage administration , else get help of others.
If you are not confident of above two, please step in with care.
1. If you have done any installition or upgradition of Datastage previously then you can go straight for a migration with minimal support from vendor, any way DSXCHANGE is there
2. You should have good command over Datastage administration , else get help of others.
If you are not confident of above two, please step in with care.
Thanks, BK
Hi tkbharani,tkbharani wrote:Its a bit big process in migrating 5.x to 7.x. There different way's how you install or upgrade Datastage.
1. If you have done any installition or upgradition of Datastage previously then you can go straight for a migration with minimal support from vendor, any way DSXCHANGE is there
2. You should have good command over Datastage administration , else get help of others.
If you are not confident of above two, please step in with care.
Administration part can be taken care of by experienced DS Administartors we have.
As developer,what are the necessary changes that needs to be encorporated to your datastage job???There are lots of batch jobs running in 5.22.Will they be affected in any way due to migration???
Thanks
JaiPrakash
-
- Participant
- Posts: 54607
- Joined: Wed Oct 23, 2002 10:52 pm
- Location: Sydney, Australia
- Contact:
Install 7.5.2.
Export projects from 5.2. Verify (import into 5.2 without actually importing anything).
Create corresponding projects in 7.5.2.
Import into 7.5.2 projects.
Re-compile jobs and routines on 7.5.2 just in case (use Multi-Job Compile tool).
Done.
Export projects from 5.2. Verify (import into 5.2 without actually importing anything).
Create corresponding projects in 7.5.2.
Import into 7.5.2 projects.
Re-compile jobs and routines on 7.5.2 just in case (use Multi-Job Compile tool).
Done.
IBM Software Services Group
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.