Hi
I want to schedule through datastage director. But I want to run the schedule with a specific userid. How can I do that ?
Right now it is using "NT AUTHORITY\system". But I want to be abc123.
thanks in advance
thanks
nivas
Datastage Director Scheduler running with specific userid
Moderators: chulett, rschirm, roy
-
- Participant
- Posts: 54607
- Joined: Wed Oct 23, 2002 10:52 pm
- Location: Sydney, Australia
- Contact:
Go to your Administrator client, open the project properties then choose the Schedule tab. Here you can specify the user to be used for scheduled jobs and, indeed, test it.
Note that this is available only where DataStage engine is on a Windows platform.
Note that this is available only where DataStage engine is on a Windows platform.
IBM Software Services Group
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.