Hi,
When we tried to run the Job Sequences developed on v 7.5.1 A in version 8.0.0.1 the Job Sequences were aborted.
The error messages are:
1)
main_program: APT_PMConnectionRecord::rsh: fork failed, Resource temporarily unavailable
main_program: APT_PM_LocalShell: fork failed, errno = 11
main_program: APT_PMConnectionRecord::rsh: fork failed, Resource temporarily unavailable
APT_PMConnectionRecord::rsh: fork failed, Resource temporarily unavailable
main_program: The section leader on etlqa1 died
main_program: **** Parallel startup failed ****
This is usually due to a configuration error, such as
not having the Orchestrate install directory properly
mounted on all nodes, rsh permissions not correctly
set (via /etc/hosts.equiv or .rhosts), or running from
a directory that is not mounted on all nodes. Look for
error messages in the preceding output.
2) main_program: Error parsing modify adapter: Error in binding: Expected destination field selector, got: ";"; input:
Please suggest me on these..
Thanks,
Jasti.
7.5.1 A to Hawk(8.0.0.1) DataStage Migration
Moderators: chulett, rschirm, roy
If you have checked the APT_CONFIG file syntax and it is correct, then most likely your DS Server isn't sufficiently powerful or not configured with enough memory to deal with all the PX processes. Try a smaller APT_CONFIG file configuration and see if that fixed the problem.
<a href=http://www.worldcommunitygrid.org/team/ ... TZ9H4CGVP1 target="WCGWin">
</a>
</a>