Ok, brain-lock alert! We upgraded from 6.0 to 7.5.2 on Windows. There are routines in sequence that are not working after the upgrade. For example, I have a routine that reads a parameter from a text file, in this case, an email address.
Here is the log message it produces:
-----------------------------------------------------
TstSeq.JobControl(@GetDatedParameter_TOADDR): Routine DSU.GetDatedParameter did not finish OK, return code = 'desilvio@eticomm.net'
-----------------------------------------------------
The routine is returning 'desilvio@eticomm.net', which DS apparently is taking as a non-zero value, meaning it's failing. I'm sure this is something simple but I cant figure it. Any hlep is appreciated
Routine in sequence giving "Unhandled failure"
Moderators: chulett, rschirm, roy
When a routine returns a 'non-zero' value and you have the 'automatically handle activities that fail' option enabled, they are considered to have failed. It considers it 'unhandled' because you haven't provided trigger conditions to handle the 'failure' so it handles it for you.
We've discussed this many (many) times, a search for "did not finish OK" should turn them up.
![Wink :wink:](./images/smilies/icon_wink.gif)
We've discussed this many (many) times, a search for "did not finish OK" should turn them up.
-craig
"You can never have too many knives" -- Logan Nine Fingers
"You can never have too many knives" -- Logan Nine Fingers
-
- Participant
- Posts: 54607
- Joined: Wed Oct 23, 2002 10:52 pm
- Location: Sydney, Australia
- Contact: