We are having a scenario where we are having multiple subsequences. Lets say
S1, S2, S3
Now these sequences are having a custom trigger where we are checking job status of each job and if its not equal to 1 then we are terminating the sequence.
Also we are having following parameters set in Administrator: -
1.Add checkpoints so that sequence is restartable on failure.
2.Automatically handle activities that fail.
3.Log warnings.......
Now we are calling these subsequences in a master sequence M1 as: -
Code: Select all
S1---->S2---->S3
But still if any of the subsequence S1, S2 or S3 fails then the master sequence M1 is not getting aborted, but is showing Finished(See Log), hence the master sequence is not restartable. Also in master sequence I can not use jobstatus logic because there are so many of these subsequences. Can anyone suggest how to achieve this.