Job Locked
Moderators: chulett, rschirm, roy
-
- Participant
- Posts: 54607
- Joined: Wed Oct 23, 2002 10:52 pm
- Location: Sydney, Australia
- Contact:
I presume you mean Cleanup Resources to log out the other user. This is a clean logout, but may take some time to complete. For safety, it is better to release all the locks owned by that process in the client before logging the process out. Then wait 2-4 minutes for the system to "clean up".
IBM Software Services Group
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.
Is 'cleanup resource' will affect the remaing running jobs
I mean, will the 'cleanup resource' option leads to any job aborts or data lost?ray.wurlod wrote:I presume you mean Cleanup Resources to log out the other user. This is a clean logout, but may take some time to complete. For safety, it is better to release all the locks owned by that process in ...
Srdhr
The "cleanup resource" method will result in lost data if the job is locked because it is running; if the job is locked for editing then just the changes since the last save will be lost.
<a href=http://www.worldcommunitygrid.org/team/ ... TZ9H4CGVP1 target="WCGWin">
</a>
</a>