sirs,
when i run a sequence. it gets aborted by saying (controller problem invalid job handle) .can u help me to figure out the problem.the sequence consist of reconcilation job runs seven times with dfferent invocation _id..
thanks in advance
invalid job handle
Moderators: chulett, rschirm, roy
-
- Premium Member
- Posts: 45
- Joined: Tue Aug 29, 2006 2:59 am
- Location: Bangalore
Re: invalid job handle
Do you have any Job control routines attached to this seq?Edwink wrote:sirs,
when i run a sequence. it gets aborted by saying (controller problem invalid job handle) .can u help me to figure out the problem.the sequence consist of reconcilation job runs seven times with dfferent invocation _id..
thanks in advance
-
- Participant
- Posts: 54607
- Joined: Wed Oct 23, 2002 10:52 pm
- Location: Sydney, Australia
- Contact:
Step 1: read the entire message. Which job generated the invalid job handle?
Step 2: check that job in Status view in Director. Discover that is it not in a runnable state. Correct that.
Step 3: fix the job sequence so that the rule is "reset if required, then run".
Step 2: check that job in Status view in Director. Discover that is it not in a runnable state. Correct that.
Step 3: fix the job sequence so that the rule is "reset if required, then run".
IBM Software Services Group
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.