Hi
is it possible to stop a Job from its Job control?
I have a job server, release 7.1, processing a flow of data from a sequential file to an Oracle8i Table. But now I need to add a new funcionality. The Job'll start only after checking the existence of a flat file. If the file exists then the job'll go on else it'll be stopped.
Can I do that in the Job Control?
Thank you in advance
Umberto
Terminate a Job in Job control
Moderators: chulett, rschirm, roy