Hi All,
I would like to know if we can reset an aborted job(not manually) in a job sequence or Job Control. What I would like to achieve is, if one of my jobs in the Job sequence fails, I want that job to be reset again and start(try) running rather than me going and resetting the job manually. If there's a way around, any guidance would be great.
Thanks in advance
Kris.
automatic reset of an aborted job
Moderators: chulett, rschirm, roy
-
- Participant
- Posts: 437
- Joined: Fri Oct 21, 2005 10:00 pm
Re: automatic reset of an aborted job
One of the properties is execution action, set it to reset if required and then run.
Keith Williams
keith@peacefieldinc.com
keith@peacefieldinc.com
Hi
Search for Check Point restart. You can also find it documented. The check option available in job property. If this ain't enabled, whenever you rerun the sequence, you would end up run all the job from the scratch. Also Include 'Reset if required and Rerun' so that you can restart from the point where it got aborted.
Search for Check Point restart. You can also find it documented. The check option available in job property. If this ain't enabled, whenever you rerun the sequence, you would end up run all the job from the scratch. Also Include 'Reset if required and Rerun' so that you can restart from the point where it got aborted.
Impossible doesn't mean 'it is not possible' actually means... 'NOBODY HAS DONE IT SO FAR'
Hi Kumar,
My requirement is, If any of my jobs in the Job Sequence fail, I want that job to restart(reset and rerun) by itself automatically for 'n' number of times (1<n<10) before it gives up on restarting and then send an abort message or failure notification. I was wondering if anyone could guide me on those lines, if its possible.
Thanks
Kris.
My requirement is, If any of my jobs in the Job Sequence fail, I want that job to restart(reset and rerun) by itself automatically for 'n' number of times (1<n<10) before it gives up on restarting and then send an abort message or failure notification. I was wondering if anyone could guide me on those lines, if its possible.
Thanks
Kris.
I guess it may not be easy using Job Sequence. But you can achieve the same using the shell through which the sequece can be called. Just frame a loop for 10 times and check for RC. If it passes call the next sequence where the Email notification present else rerun the sequence. Pass the status of the Sequence to the next sequence.
Impossible doesn't mean 'it is not possible' actually means... 'NOBODY HAS DONE IT SO FAR'