DSXchange Members,
I have a problem while upgrading the DS from 7.1.0.8 t0 7.5.1.A on Sun Solaris 2.8 Machine.
I have 6 projects (All Server Jobs). When I did the upgrade, it completed with 2 warnings, only two of my projects got upgraded. Other 4 was not!!
This is what I found in the Log file:
Copying 'Template' project files
Error: child process timeout, killing pid (12807)
Error: child process timeout, killing pid (12807)
Warning: command 'uvsh UPDATE.ACCOUNT' returned (9).
PRINTER memory segment removed
1 record copied.
Warning: Errors detected during project configuration
===============================================
Installing Object Call
Thu Jan 5 12:04:00 EST 2006
===============================================
Done.
Please advice on this issue.
Thanks,
ivar38
Problem with Datastage Upgrade
Moderators: chulett, rschirm, roy
Contact technical support. You'll probably have to create the projects fresh and then import the jobs if tech support can't help you fix the issue.
Kenneth Bland
Rank: Sempai
Belt: First degree black
Fight name: Captain Hook
Signature knockout: right upper cut followed by left hook
Signature submission: Crucifix combined with leg triangle
Rank: Sempai
Belt: First degree black
Fight name: Captain Hook
Signature knockout: right upper cut followed by left hook
Signature submission: Crucifix combined with leg triangle
Dear Members,
Initially before doing the upgrade under "root", we tried doing it using "Sudo" for root. I got similar errors but installation completed succesfully. Really it did not complete.. The projects did not get configured and only 2 projects got upgraded. That is where we contacted the IBM people. They asked us to do it under "root". We did it and still have same problem.
Could this be all because we initially did it under Sudo??
Please advice..
Thanks,
ivar
Initially before doing the upgrade under "root", we tried doing it using "Sudo" for root. I got similar errors but installation completed succesfully. Really it did not complete.. The projects did not get configured and only 2 projects got upgraded. That is where we contacted the IBM people. They asked us to do it under "root". We did it and still have same problem.
Could this be all because we initially did it under Sudo??
Please advice..
Thanks,
ivar