Hi Guys,
Good morning.
I have a Scheduled job which runs daily but my problem is if the job aborts on one day i have reset manually and then run.
But i want to do it automatically.
Note: i know how to do it in Job Sequence.
Please help me out.
Thnaks
Reddy
How do you make the job in runnable state after aborts
Moderators: chulett, rschirm, roy
One of the options in a sequence lets you reset a job before running. This is exactly what you need. You can also trigger this through a dsjob -run -reset call from the command line if you prefer that approach.
<a href=http://www.worldcommunitygrid.org/team/ ... TZ9H4CGVP1 target="WCGWin">
</a>
</a>
-
- Participant
- Posts: 24
- Joined: Fri Aug 26, 2005 3:52 pm
- Contact:
-
- Participant
- Posts: 54607
- Joined: Wed Oct 23, 2002 10:52 pm
- Location: Sydney, Australia
- Contact:
What you want to do is not possible with a job in isolation.
The "reset if required" functionality can only be performed in some kind of wrapper, such as a job sequence or a shell script.
The "reset if required" functionality can only be performed in some kind of wrapper, such as a job sequence or a shell script.
IBM Software Services Group
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.