In a sequence job, if any of the intermediate job is aborted, is there any way, it can notify sequence job is also got aborted?
During the reseting of this sequence job, can we have an option to reset all the jobs which are not in a runnable state to become runnable?
Jobs within Sequence job got aborted, but Sequece didnt.
Moderators: chulett, rschirm, roy
Jobs within Sequence job got aborted, but Sequece didnt.
Thanks with regards,
videsh.
videsh.
There has been a number of postings on this topic. Do a search.
One of which is viewtopic.php?t=92131&start=0&postdays= ... aborttolog
One of which is viewtopic.php?t=92131&start=0&postdays= ... aborttolog
Precious
Mosher's Law of Software Engineering: Don't worry if it doesn't work right. If everything did, you'd be out of a job.
Mosher's Law of Software Engineering: Don't worry if it doesn't work right. If everything did, you'd be out of a job.