Hi,
I am having 32 jobs, in which i will be generating the Dsjobreport into a folder, i am having another job wich takes data from the folder which contains the DsjobReport and will take into our format. My doubt is that in Job Sequencer, cani call the second job after completion of each job 32 times.
Secon job has a folder stage, which takes the files from the folder and does the processing through transformer and populates a sequential file with the needed format.
Regards,
Rajeev Prabhu
Job Sequencer
Moderators: chulett, rschirm, roy
-
- Participant
- Posts: 136
- Joined: Wed Sep 29, 2004 5:56 am
- Location: Chennai
- Contact:
-
- Participant
- Posts: 85
- Joined: Fri Jun 04, 2004 2:30 am
- Location: Melbourne, Australia
- Contact:
-
- Premium Member
- Posts: 385
- Joined: Wed Jun 16, 2004 12:43 pm
- Location: Virginia, USA
- Contact:
Code: Select all
JobActivity 1 ---> S S
. E T ---> JobActivity (second job)
. Q A
. U G
. E E
. N
. C
. E
JobActivity 32 --> R
Chuck Smith
www.anotheritco.com
www.anotheritco.com
Either way would work. David's would run the jobs in a serial fashion, while Chuck's would run them in parallel... which would be faster as long as your job design will accomdate that. If you do, make sure the Sequence stage has its property set to 'All', by the way.
If you have 7.5, the first methodology should be able to be done in a Sequencer now that the Loop Start and Loop Stop stages have been added.
If you have 7.5, the first methodology should be able to be done in a Sequencer now that the Loop Start and Loop Stop stages have been added.
-craig
"You can never have too many knives" -- Logan Nine Fingers
"You can never have too many knives" -- Logan Nine Fingers
-
- Participant
- Posts: 54607
- Joined: Wed Oct 23, 2002 10:52 pm
- Location: Sydney, Australia
- Contact: