Is Copying of stages from one job to other job not possible in DS 7.0.
When i tried this, it was not possible. But i tried to copy in the same job it happened.
In DS 7.1, this was possible , but in DS 7.0, it was not possible.
Is it possible in DS 7.0
Copying of stages from one job to other job
Moderators: chulett, rschirm, roy
Yes, it is possible. One of the very nice things they finally added in the 7.x versions was copy and paste, which means you can copy a stage in one job and paste it into another. I'm running 7.0.1 right now and do it all the time.
The other ong-awaited big winner was allowing 'dangling links'. :D
The other ong-awaited big winner was allowing 'dangling links'. :D
-craig
"You can never have too many knives" -- Logan Nine Fingers
"You can never have too many knives" -- Logan Nine Fingers
-
- Participant
- Posts: 3593
- Joined: Thu Jan 23, 2003 5:25 pm
- Location: Australia, Melbourne
- Contact:
Are you attempting to copy stages between jobs in seperate Designer sessions? You can only copy stages inside the one Designer. This should work in version 7.0.
Certus Solutions
Blog: Tooling Around in the InfoSphere
Twitter: @vmcburney
LinkedIn:Vincent McBurney LinkedIn
Blog: Tooling Around in the InfoSphere
Twitter: @vmcburney
LinkedIn:Vincent McBurney LinkedIn
Thanks for your replies, but i should say sorry because ,i tried to copy a routine activity of a sequencer job into a server job. This is the mistake i did. So, i did'nt get copied. Immediately without checking the jobs , i posted this
Otherwise, we can copy between two DS sessions also, if the jobs are of same type.
Thanks once again.
Otherwise, we can copy between two DS sessions also, if the jobs are of same type.
Thanks once again.
Aim high