Error calling subroutine: DSR_EXECJOB (Action=5); check DataStage is set up correctly in project CFSPROD
(The connection is broken (81002))
Error calling subroutine: DSR_PROJECT (Action=7); check DataStage is set up correctly in project CFSPROD
(The connection is broken (81002))
They occurred on all of the director sessions, altough it seemed that they would come up differnt amounts of times on each session. i.e. When I closed one, the next would come up, but some times the same error would come up a couple of times before the next one would. I looked at the project it references and nothing unusual happened. One job aborted for reasons we know about, and the other 100 or so ran successfully, or with (See log) type warnings, that can all be explained. Again the director was running on the server, so it was not network connectivity being broken.Error calling subroutine: DSR_LOG (Action=3); check DataStage is set up correctly in project CFSPROD
(The connection is broken (81002))
Any thoughts on this???