i've a problem. I launch a DS parallel job. This job return an error code -"14 DSJE_TIMEOUT"
Can i set an option for increment the job timeout????
Help me pls!!
![Crying or Very sad :cry:](./images/smilies/icon_cry.gif)
Massimiliano
Moderators: chulett, rschirm, roy
powerinmind2 wrote:Hi all,
i've a problem. I launch a DS parallel job. This job return an error code -"14 DSJE_TIMEOUT"
Can i set an option for increment the job timeout????
Help me pls!!![]()
Massimiliano
Teej wrote:To run multiple instances of DataStage PX jobs, you MUST upgrade to 7.0.1. It is not possible with any lower versions.
-T.J.
That is what I meant by running multiple instances of the same job. You want to run them both at the same time.I want call the same job, from two different shell unix at the same time.
Teej wrote:To run multiple instances of DataStage PX jobs, you MUST upgrade to 7.0.1. It is not possible with any lower versions.
-T.J.