Multiple messages at project level Message handler
Posted: Wed Apr 15, 2015 12:14 pm
Perhaps Iam missing something here.
In Admistrator Client, under Prallel tab, under under Message handler for parallel jobs, Iam able to select one of the named Message handler from the drop down list.
That particular message handler is getting applied to all the jobs project wide.
But I wanted to apply multiple message handler for the project wide.
How would I do it.
If I select the other message handler, from the drop down, the prevous one does not stays effective.
In Admistrator Client, under Prallel tab, under under Message handler for parallel jobs, Iam able to select one of the named Message handler from the drop down list.
That particular message handler is getting applied to all the jobs project wide.
But I wanted to apply multiple message handler for the project wide.
How would I do it.
If I select the other message handler, from the drop down, the prevous one does not stays effective.