I have a situation where I have to determine any cross flow dataset dependency which is like below
Assumes one sequence job S1,it consists two parallel job P11 and P12 and another sequence S2,it consists two parallel job P21 and P22.
Now assume one dataset has been written in the P11 job and which is ds1.Now ds1 is directly using in P21.So in this case ds1 is being created in one flow and being used in another flow. I need to find out this type of datasets. Can you please suggest what is the best way for this?
Assumes one sequence job S1,it consists two parallel job P11 and P12 and another sequence S2,it consists two parallel job P21 and P22.
Now assume one dataset has been written in the P11 job and which is ds1.Now ds1 is directly using in P21.So in this case ds1 is being created in one flow and being used in another flow. I need to find out this type of datasets. Can you please suggest what is the best way for this?