Is it possible to call a server routine in a Parallel Job
Posted: Sun Mar 31, 2013 9:31 pm
Hi Guys,
There is a server routine. Is it possible to call it in a Transformer stage in a Parallel job or i need to write parallel routine for it.
Cheers!!!!
There is a server routine. Is it possible to call it in a Transformer stage in a Parallel job or i need to write parallel routine for it.
Cheers!!!!