Oracle Connector Warning
Posted: Thu Feb 28, 2013 9:53 am
Hi
I am getting a warning when using oracle connector
The connector was configured to run in parallel mode on 8 nodes, but the partitioned reads were not enabled. The connector will run in sequential mode.
Then the job is getting aborted with error as
Parallel job reports failure (code 256)
Please can you tell me what the problem is?
Thanks
I am getting a warning when using oracle connector
The connector was configured to run in parallel mode on 8 nodes, but the partitioned reads were not enabled. The connector will run in sequential mode.
Then the job is getting aborted with error as
Parallel job reports failure (code 256)
Please can you tell me what the problem is?
Thanks