APT_combined operator controller error

Post questions here relative to DataStage Enterprise/PX Edition for such areas as Parallel job design, Parallel datasets, BuildOps, Wrappers, etc.

Moderators: chulett, rschirm, roy

Post Reply
peep
Premium Member
Premium Member
Posts: 162
Joined: Mon Aug 20, 2012 6:52 pm

APT_combined operator controller error

Post by peep »

APT_combined_operator_controller:conversion error calling conversion routine date from ustring data may have lost.

This is the warning message and the job got aborted ...
what could be the reasone?
ShaneMuir
Premium Member
Premium Member
Posts: 508
Joined: Tue Jun 15, 2004 5:00 am
Location: London

Post by ShaneMuir »

Well the reason for the error is because there an error converting from a string to a date somewhere in your job.

If you want to see where in the job the problem is you can add the environment variable APT_DISABLE_COMBINATION and set to true.

Did the job abort as part of a sequence? If so then an error message is enough to cause the sequence to abort if your triggers are set that way.
Post Reply