DB2 load parallel instance
Posted: Wed Aug 08, 2012 12:43 am
We are running DB2 connector stage with Bulk load option.
We are having following configuration :
4 cpu
4 Nodes in configuration file.
All are non-db2 nodes as no node is specified for db2 only.
When the job is running in log it is showing :
running on non-db2 nodes.
But only one process is being generated.
As there are 4 nodes,it should create 4 parallel process.
Please help.
We are having following configuration :
4 cpu
4 Nodes in configuration file.
All are non-db2 nodes as no node is specified for db2 only.
When the job is running in log it is showing :
running on non-db2 nodes.
But only one process is being generated.
As there are 4 nodes,it should create 4 parallel process.
Please help.