Parallel transformer versus BASIC Transformer
Posted: Wed Sep 07, 2011 1:58 pm
I am trying to rewrite a server job to parallel job for performance improvement.
Currently the server job calls 3 server routines. I have 2 options here.
1. Create Parallel routines and call them in the Parallel transformer
2. Use a BASIC transformer and continue to use the
server routines. In this case 1 would need 2 BASIC transformers based on 2 constraints.
Would the usage of BASIC transformer in a parallel job would lower the performance considerably.
I am curious as the original ask is to better the performance of the current job.
Currently the server job calls 3 server routines. I have 2 options here.
1. Create Parallel routines and call them in the Parallel transformer
2. Use a BASIC transformer and continue to use the
server routines. In this case 1 would need 2 BASIC transformers based on 2 constraints.
Would the usage of BASIC transformer in a parallel job would lower the performance considerably.
I am curious as the original ask is to better the performance of the current job.