Page 1 of 1

Converting 2 node Parallel Jobs to 4 node

Posted: Sun Nov 21, 2010 1:42 am
by G.K.K
Hi,

I am using AIX server, in which datastage v8.1 is installed.

I have a scenario that while developing the PX jobs i used 2 node configuration. Now i want the jobs to run on 4 node configuration due to performance enhancements. So, If i change the configuration file to 4 node, then will i get any warnings during the execution of parallel jobs??


Thanks in Advance
G.K.K

Posted: Sun Nov 21, 2010 3:16 am
by ray.wurlod
No new warnings.

You will continue to get any warnings you get from a two-node configuration.