Hi

Creating multiple instance of sequence jobs means ?
I wanted to know what exactly need to be done to create 3 instances of an existing sequence jobs ? what things I need to take care while doing this.

thnks in advance
pravin1581
Premium Member
Premium Member
Posts: 497
Joined: Sun Dec 17, 2006 11:52 pm
Location: Kolkata
Contact:

Re: Maltiple instances of jobs

Post by pravin1581 »

First thing you need to do is make the job sequence as multiple instance one, that you can set from the Job property and then you can run as many instances as you want, but the invocation id passed shld be separate for separate sequences.
kumar_s
Charter Member
Charter Member
Posts: 5245
Joined: Thu Jun 16, 2005 11:00 pm

Post by kumar_s »

Are the underlying jobs multiple instance too?