Import of V8.X code into V7.x
Posted: Tue Mar 16, 2010 7:08 am
Hi,
Was wondering if anyone had attempted importing code from a later version of Datastage (8.X) into earlier versions.
My scenario here is that we have a month of parallel run in production - with both V8 and older V7 to do our data testing and performance testing etc. And here come some emergency fixes to code and since our developmetn and integration environments are already upgraded to new V8 - i can test my changes only there and migrate only V8 code. But in production i have both V7.5 and V8.1 and i need to migrate code to both.
when i try to import the V8.1 dsx into V7.5 it throws a warning but if i skip that warning i can probably proceed, but am wondering if that is a good idea. As an alternative i am only copy-pasting the job design from the designer browser and this works, but in general when i have more jobs to be fixed for one prod emergency, its such an overhead and room for error.. hence i seek ideas..
Thanks in advance
Was wondering if anyone had attempted importing code from a later version of Datastage (8.X) into earlier versions.
My scenario here is that we have a month of parallel run in production - with both V8 and older V7 to do our data testing and performance testing etc. And here come some emergency fixes to code and since our developmetn and integration environments are already upgraded to new V8 - i can test my changes only there and migrate only V8 code. But in production i have both V7.5 and V8.1 and i need to migrate code to both.
when i try to import the V8.1 dsx into V7.5 it throws a warning but if i skip that warning i can probably proceed, but am wondering if that is a good idea. As an alternative i am only copy-pasting the job design from the designer browser and this works, but in general when i have more jobs to be fixed for one prod emergency, its such an overhead and room for error.. hence i seek ideas..
Thanks in advance