Combine both Server and Parallel Jobs in the Same Sequence
Posted: Mon Dec 14, 2009 1:09 pm
Hi all,
I had tried it before, but out of curiosity, I went ahead and added both server and parallel jobs into the same Job Sequence. The sequence ran successfully.
Would you say it is not a good practice? Or is it forbidden to do it?![Rolling Eyes :roll:](./images/smilies/icon_rolleyes.gif)
I had tried it before, but out of curiosity, I went ahead and added both server and parallel jobs into the same Job Sequence. The sequence ran successfully.
Would you say it is not a good practice? Or is it forbidden to do it?
![Rolling Eyes :roll:](./images/smilies/icon_rolleyes.gif)