Page 1 of 1

Operator terminated abnormally: received signal SIGSEGV

Posted: Wed Sep 30, 2009 12:51 am
by victordsouza
Hi,

I have a simple job of loading data from source to target.

For source I have a Oracle Enterprise Stage
Target I have Dynamic_RDBMS Stage

I am getting the following error message when I run the job

Operator terminated abnormally: received signal SIGSEGV

Please help or advice.

Thanks

Posted: Wed Sep 30, 2009 2:42 am
by ArndW
Which operator? (hint: post the full error message).

Operator terminated abnormally: received signal SIGSEGV

Posted: Mon Oct 05, 2009 5:12 am
by victordsouza
I did not get much information from the log

Here is the log details

Dynamic_RDBMS_26,0: Info: Sample_test.Dynamic_RDBMS_26: Using NLS map ISO-8859-1

Dynamic_RDBMS_26,0: Operator terminated abnormally: received signal SIGSEGV

Thanks

Posted: Mon Oct 05, 2009 5:35 am
by ArndW
Does the error happen on row 1? Where does the Dynamic stage point to?