process control in sequencers
Posted: Tue Sep 01, 2009 4:42 pm
Hello Everyone,
I have a master sequencer that calls a child sequencer:
Master Seq -> Activity1 -> Child Seq -> Activity2 -> Activity3
In my child sequencer I am checking a condition and if true I branch to an Email stage and no other activities run in the child sequencer. However control returns to the master sequencer and then Activity2 and 3 run there(which I don't want - I want the parent sequencer to stop also - when condition is met in child sequencer).
Not sure if this can be done in DS.
Any help is appreciated.
Thanks
Robert
I have a master sequencer that calls a child sequencer:
Master Seq -> Activity1 -> Child Seq -> Activity2 -> Activity3
In my child sequencer I am checking a condition and if true I branch to an Email stage and no other activities run in the child sequencer. However control returns to the master sequencer and then Activity2 and 3 run there(which I don't want - I want the parent sequencer to stop also - when condition is met in child sequencer).
Not sure if this can be done in DS.
Any help is appreciated.
Thanks
Robert