Job Status 99
Posted: Mon Jun 01, 2009 12:12 pm
Hi,
I have some sequences which is calling couple of multiple instance jobs along with regular Load jobs, so when I try to call those sequences in one master sequence then I am facing problem called status 99.
" NW_ONE_EPM_SEQ_Recon_Daily_Balance..JobControl (DSWaitForJob): Job NW_ONE_Truncate_Table_before.PS_NW_RCN_D_DD_SF has finished, status = 99 (Not running)"
Master seq is triggering 3 sub sequences and those sub sequences are calling multiple instance jobs. first job is complting with status Finished, but it's not passing the status to next link staying that status is 99 not running.
" " NW_ONE_EPM_SEQ_Recon_Daily_Balance..JobControl (DSWaitForJob): Job NW_ONE_Truncate_Table_before.PS_NW_RCN_D_DD_SF has finished, status = 99 (Not running)""
Any help is appriciated.
I have some sequences which is calling couple of multiple instance jobs along with regular Load jobs, so when I try to call those sequences in one master sequence then I am facing problem called status 99.
" NW_ONE_EPM_SEQ_Recon_Daily_Balance..JobControl (DSWaitForJob): Job NW_ONE_Truncate_Table_before.PS_NW_RCN_D_DD_SF has finished, status = 99 (Not running)"
Master seq is triggering 3 sub sequences and those sub sequences are calling multiple instance jobs. first job is complting with status Finished, but it's not passing the status to next link staying that status is 99 not running.
" " NW_ONE_EPM_SEQ_Recon_Daily_Balance..JobControl (DSWaitForJob): Job NW_ONE_Truncate_Table_before.PS_NW_RCN_D_DD_SF has finished, status = 99 (Not running)""
Any help is appriciated.