Page 1 of 1

Is it possible to use server routine in parallel jobs

Posted: Thu Apr 02, 2009 2:52 am
by sgpatil
I have written server routine, will it be possible to use same routine in parallel jobs

Posted: Thu Apr 02, 2009 3:06 am
by mahadev.v
Yes. Transform routines in Basic Transformer. Before/After subroutines in Job properties or in basic transformer before/after subroutine tab.