DataStage 7.5.1 A Server Edition Sequence Problem

Post questions here relative to DataStage Enterprise/PX Edition for such areas as Parallel job design, Parallel datasets, BuildOps, Wrappers, etc.

Moderators: chulett, rschirm, roy

Post Reply
sarat.srinivas@tcs.com
Participant
Posts: 26
Joined: Fri Jul 13, 2007 6:33 am

DataStage 7.5.1 A Server Edition Sequence Problem

Post by sarat.srinivas@tcs.com »

Hi,

We are using DataStage 7.5.1 A Server Edition on Windows OS. The issue we have here is with the Job Seq. Suppose let's say we have 2 jobs in the sequence & we have enabled the trigger in the first job as "DS.JS = RUN OK OR DS.JS = RUN WARN" meaning if the first job finishes successfully or with warnings then run the second job of the sequence. This is not working in the sense even if firstjob aborts, datastage is exectuing the second job. Any ideas are welcome.

Thanks,
Sarat.
ray.wurlod
Participant
Posts: 54607
Joined: Wed Oct 23, 2002 10:52 pm
Location: Sydney, Australia
Contact:

Post by ray.wurlod »

Get the syntax correct by selecting activity variables and DS Constants from the Expression Editor operand menu.

Code: Select all

JobActivity1.$JobStatus = DSJS.RUNOK Or JobActivity1.$JobStatus = DSJS.RUNWARN
IBM Software Services Group
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.
Post Reply