Page 1 of 1

Combining server and parallel jobs in a sequence

Posted: Tue Jan 06, 2009 2:58 am
by chandra4u
Can I combine server job and parallel job in one sequence. Have anybody tried that. I just want to know by combining these two whether we can get a good performance.

Re: Combining server and parallel jobs in a sequence

Posted: Tue Jan 06, 2009 3:14 am
by dr.murthy
chandra4u wrote:Can I combine server job and parallel job in one sequence. Have anybody tried that. I just want to know by combining these two whether we can get a good performance.
yes we can use both server an parallel jobs in a job sequence

Posted: Tue Jan 06, 2009 8:51 am
by chulett
As noted, Sequence jobs can run both Server or Parallel jobs. However, that has nothing to do with 'getting good performance' which is all about the individual job designs, not the fact that they are being run by a Sequence.