Hi all.
I have a sequencer that has 4 jobs. I have added to Job_1 the DS_PXDEBUG parameter and set it to 0. I have not added DS_PXDEBUG to the other 3 jobs. I have added DS_PXDEBUG to the sequencer and set it to 1. As expected Job_1 is producing the additional messages in Director. All the other jobs are also producing the additional messages in director.
Why are the other jobs producing the additional messages? I have not added DS_PXDEBUG to the other job parameter list.
Thanks in advance for any help.
Do jobs in a sequencer inherit the "DS_PXDEBUG = 1"
Moderators: chulett, rschirm, roy