TD Enterprise stage replaced with TD connector stage issue
Posted: Wed Oct 22, 2008 9:46 am
Orignal Job:
Target Stage = TD Enterprise stage
RCP = ON
Silently Drop Column = TRUE
Changed JobTarget Stage = TD Connector stage
RCP = ON
PROBLEM The jobs is dynamic job can be called for different tables i am looking for any option which can be used if there are extra columns coming from income stage which are not present in the target then they should be ignored, any such option available in Teradata connector stage?
Target Stage = TD Enterprise stage
RCP = ON
Silently Drop Column = TRUE
Changed JobTarget Stage = TD Connector stage
RCP = ON
PROBLEM The jobs is dynamic job can be called for different tables i am looking for any option which can be used if there are extra columns coming from income stage which are not present in the target then they should be ignored, any such option available in Teradata connector stage?