Controller problem and Error calling DSRunJob(code=-14)

Posted: Tue Aug 12, 2008 12:07 am
by Tej
HI,
can any one help in this issue,
the sequencer is failed due to this error.

Controller problem and Error calling DSRunJob(code=-14)
[Timed out while waiting for an event]


Thanks in advance

Posted: Tue Aug 12, 2008 12:40 am
by ray.wurlod
Search

This has been asked a bajillion times in the past. Or is it a bazillion?

Posted: Tue Aug 12, 2008 12:41 am
by stevenzhangshen
Maybe the server is overloaded and two many jobs are running. You'd better to restart your DS server.

Avoid Using Sequencer Stage

Posted: Tue Aug 12, 2008 12:49 am
by mandyli
Hi,
This is due to overlaod in the server. Your job sequencer can avoid this by limiting the number of jobs that are running in parallel. Say you are running 10 jobs in parallel, then you can split them into two sets of five jobs each with a sequencer stage in between two sets.

Re: Avoid Using Sequencer Stage

Posted: Tue Aug 12, 2008 1:19 am
by Tej
mandyli wrote:Hi,
This is due to overlaod in the server. Your job sequencer can avoid this by limiting the number of jobs that are running in parallel. Say you are running 10 jobs in parallel, then you can split them into two sets of five jobs each with a sequencer stage in between two sets.
thanks alot for the information

Posted: Tue Aug 12, 2008 7:02 am
by chulett
ray.wurlod wrote:This has been asked a bajillion times in the past. Or is it a bazillion?
With a "j". :wink: