Can we run two separate flows to a single target
Posted: Mon Oct 29, 2007 6:15 am
Hi ,
can we have a job design which contain multiple flows disigned separatly (no link between the flows)
writing data into a single target .
We take different instances for the same target (one target instance for one flow)
and specify the orderof loading data to target ,is there any option as targetloadplan in informatica?
can we have a job design which contain multiple flows disigned separatly (no link between the flows)
writing data into a single target .
We take different instances for the same target (one target instance for one flow)
and specify the orderof loading data to target ,is there any option as targetloadplan in informatica?