I have to run 2 jobs parallely and if both of them are ok I need to do the 3rd job, how can i design it and how do i check the status of the first 2 jobs.
this is on windows.Everthing has to be scheduled to run.
sequence
Moderators: chulett, rschirm, roy
-
- Participant
- Posts: 612
- Joined: Thu May 03, 2007 4:59 am
- Location: Melbourne
You might want to do this in a Sequence job. Give output link from both jobs with 'OK' trigger (If you want to go forward for 'Finished with warning' you have to add those triggers also) to a sequencer stage with 'ALL' mode.